Planning Board reviewed a major proposal for 28 Haverhill Rd (two 63-unit condominium buildings with 25 affordable units), directed staff to solicit peer-review quotes for engineering, traffic, stormwater, utilities, and environmental review, and continued review. The Board authorized a peer review for a house addition at 30 Lake Attitash Rd and approved the storefront sign for Barn Moth at 80 Main St.

occurred Agenda PDF Minutes Video recording AI Summary
Key decisions
Approved sign for Barn Moth at 80 Main St
Approved 6-0
Authorized peer review for the application at 30 Lake Attitash Road
Approved 6-0
Directed staff to gather quotes for peer review (engineering, traffic, stormwater, utility, environmental) for 28 Haverhill Road
Approved 6-0
Converted the erosion control bond into a performance bond for 101-107 Market St
Approved 6-0
Approved the covenant and the erosion control bond in the amount of $11,078 for 9 Alenclair Dr
Approved 6-0
Added condition that the covenant for 9 Alenclair Dr shall not be released until the landscape is complete or a landscape bond is in place
Approved 6-0
AI SUMMARY · DRAWN FROM THE MINUTES

The Board opened with a short set of administrative items and then moved into permit hearings. A sign application for Barn Moth at 80 Main Street was recommended by the Design Review Committee and approved unanimously. A small-scale project at 30 Lake Attitash Road proposing a 1,000 sf addition in the Water Resource Protection District prompted Board discussion about impervious surface and infiltration; the Board unanimously authorized a peer review of technical calculations and continued the hearing.

The meeting's principal substantive item was a detailed presentation of a large residential proposal at 28 Haverhill Road: two mirror five‑story buildings totaling 126 for‑sale condominium units (mix of one- and two-bedroom), with subsurface parking, 25 affordable units, EV spaces, on-site stormwater infiltration, trail connections, and two full-access driveways (one on Route 150 subject to MassDOT). Staff, the applicant, and consultants reviewed site constraints (wetlands, floodplain), utility plans (onsite pump station for sewer), parking strategy, and traffic analysis. Neighbors raised concerns about existing congestion, sightlines, and safety for pedestrians and cyclists; the Board responded by directing staff to gather quotes for peer reviews of engineering, traffic, stormwater, utilities, and environmental issues. The Board also handled several administrative site items: it approved converting the erosion control bond to a performance bond for 101-107 Market St, approved a covenant and an $11,078 erosion-control bond for 9 Alenclair Dr, and added a condition that the covenant not be released until landscaping is complete or a landscape bond is posted. Public comment focused largely on traffic and safety impacts from the Haverhill Road/Route 150 area and the scale and environmental impacts of the Haverhill Road proposal.

Generated by an LLM. Verify against the official record before quoting.

Points of interest

30 Lake Attitash Road — special‑permit presentation and peer‑review authorization
30 Lake Attitash Road — special‑permit presentation and peer‑review authorization
PRESENTATION
0:04:36–0:14:52 ▶ Watch
Applicant sought a special permit to add roughly 1,000 sq ft to a lakeside house within the Water Resource Protection District; the board voted to authorize a peer‑review engineer to evaluate stormwater/engineering issues and continued the hearing to June 22 to allow review.
28 Haverhill Road (Gateway Village) — full project presentation, technical Q&A, and peer‑review decision
28 Haverhill Road (Gateway Village) — full project presentation, technical Q&A, and peer‑review decision
PRESENTATION
0:15:23–2:35:09 ▶ Watch
A developer presented a detailed proposal for two five‑story buildings (126 condo units) including site layout, parking, stormwater, utilities, trails, and open space; the meeting contained extended Q&A on traffic access, parking supply, grading and public‑space design, and the board voted to retain peer reviewers and continue the hearing to June 8.

Motions & votes

AI-generated summaries of each motion's substance — not the official record. Verify against the meeting minutes or video before quoting.

@ 0:01:40 · APPROVE
Approved 6-0
Approve the storefront sign for Barn Moth at 80 Main St as submitted
MOVED · DAVID FRICK · SECONDED · JOEL NICE
@ 0:12:41 · OTHER
Approved 6-0
Authorize a peer review for the application at 30 Lake Attitash Road to evaluate technical calculations related to impervious surfaces, infiltration, and Water Resource Protection District standards
MOVED · TOM SALEMI · SECONDED · KEITH RATNER
@ 2:28:42 · OTHER
Approved 6-0
Request staff to gather quotes for peer review services (engineering, traffic, stormwater, utility, and environmental) for the 28 Haverhill Road development application
MOVED · KEITH RATNER · SECONDED · DAVID FRICK
@ 2:40:25 · APPROVE
Approved 6-0
Convert the erosion control bond into a performance bond for 101-107 Market St
MOVED · DAVID FRICK · SECONDED · KEITH RATNER
@ 2:41:49 · APPROVE
Approved 6-0
Approve the covenant and the erosion control bond in the amount of $11,078 for 9 Alenclair Dr
MOVED · DAVID FRICK · SECONDED · JOEL NICE
@ 2:42:30 · AMEND
Approved 6-0
Add condition that the covenant for 9 Alenclair Dr shall not be released until the landscape is complete or a landscape bond is in place
MOVED · KEITH RATNER · SECONDED · JOEL NICE