Project details

What is proposed

The Rocky Hill project is a residential development proposed on multiple Elm Street parcels and organized as two neighborhoods. The South Neighborhood would contain 85 for‑sale homes in a mix of single‑family, duplex, triplex and fourplex buildings. The North Neighborhood would contain 296 rental homes across 29 separate multifamily buildings, including corridor buildings, 12‑unit walk‑ups, 6‑unit manor houses and stacked town/flat buildings, for a combined total of 381 residential units. Site plans show community amenities such as a clubhouse, fieldhouse, pool, pickleball courts, dog park, grill pavilion, car barns/garages, village greens and pocket parks. Typical exterior materials cited include cementitious siding (Hardie or equivalent), white cedar shingle siding, asphalt and standing‑seam metal roofs, stone/brick veneers and painted trim.

Where and how big

The applicant describes the project site as approximately 65 acres comprising several tax parcels on the east side of Elm Street (addresses filed with the application: 265 R, 277 R, 281, 287, 287 R and 287.5 Elm Street). The site layout centers on a single boulevard entrance from Elm Street that leads to a roundabout separating the South and North Neighborhoods. Architectural plans include illustrative building sizes (for example, a 36‑unit corridor building is shown with a total gross area on the order of 46,840 square feet and 12‑unit walk‑ups are shown in the 10,000–15,000 square‑foot range in the submitted materials).

Parking, access and transportation

Primary vehicle access would be a new boulevard from Elm Street; an emergency access is shown to be provided via an existing easement through the Amesbury Animal Hospital property. The applicant proposes dedicating the boulevard as a public road from Elm Street to the roundabout while retaining all other internal roads and common areas as private. Parking is a mix of resident garages and surface spaces, with most parking screened to the rear of buildings; the submission reports parking of about 2.87 spaces per unit in the South Neighborhood and 1.68 spaces per unit in the North Neighborhood, plus seven spaces near the roundabout for public trail access. A Transportation Impact Assessment accompanies the application and the submission identifies proposed mitigation on the Route 110/I‑95 corridor; the applicant is coordinating roadway improvements with the City, MassDOT and a MassWorks grant request.

Site design, open space, wetlands and stormwater

Plans show a network of formal greens, pocket parks and connected trails that link interior open spaces to surrounding conservation lands and existing regional trails. The application indicates wooded perimeter open space will be permanently protected by conservation easements or deed restrictions and that proposed structures meet or exceed a 25‑foot wetlands setback required by the Conservation Commission. A stormwater management report and detailed drainage plans are included with the submission; plans show detention/bioretention features and erosion‑control measures intended to meet applicable standards. Utilities are shown to be installed underground and lighting specifications limit pole heights to reduce glare (parking lot poles not to exceed 18 feet; driveway/walkway lighting not to exceed 12 feet).

Affordable housing, phasing and permits

The applicant proposes that 10% of the residences be designated as affordable housing in compliance with Section XL.Q.2 of the zoning code and identifies submission of an Affirmative Fair Housing Marketing Plan as a condition of approval. The project will be constructed in phases; the applicant has agreed to provide a high‑level phasing plan and to submit a more detailed construction sequencing and Construction Management Plan following approval. The application lists additional local and state permits the applicant will pursue, including definitive subdivision approval, a stormwater permit, a Conservation Commission Notice of Intent/Order of Conditions, a demolition‑delay review, and MEPA review (the applicant intends to file a Final Environmental Impact Report).

Status and next steps

The site plan review application was filed with the Planning Board in August 2025. The applicant has participated in City Technical Review Committee and Design Review Committee meetings, submitted technical reports (including traffic, stormwater and geotechnical memoranda), and is coordinating proposed transportation mitigation with the City and MassDOT. The applicant indicates the FEIR will be filed with the Massachusetts MEPA office and that additional construction phasing and permitting materials will follow as the review proceeds.

Discussion at meetings

August 24, 2026PLANNING BOARD
New Public Hearing
Definitive subdivision review for the Rocky Hill Development on multiple Elm Street parcels (265 R, 277 R, 281, 287, 287 R, 287.5 Elm Street); scheduled 2026-08-24.
  • CONTINUE
    Continue the Rocky Hill Development public hearings (site plan and definitive subdivision for parcels at 265R, 277R, 281, 287, 287R, 287.5 Elm Street) to the Planning Board meeting of September 14, 2026.
    Approved 4-0
August 10, 2026PLANNING BOARD
Continued Public Hearing
Site plan (Section XI.V) for the Rocky Hill Development at 265 R, 277 R, 281, 287, 287 R, 287.5 Elm Street; public hearing opened 2025-09-22. Request to continue to 2026-08-24.
  • OTHER
    Direct staff to begin drafting a decision/order of conditions for the Rocky Hill Development so a draft is available for board review in advance of future hearings (for September 14).
    Approved 6-0
  • CONTINUE
    Continue the Rocky Hill Development site plan review to the August 24, 2026 meeting.
    Approved 6-0
July 27, 2026PLANNING BOARD
Continued Public Hearing
Continued public hearing for Site Plan review (Section XI.V) for the Rocky Hill Development covering multiple Elm Street parcels.
  • CONTINUE
    Continue the continued public hearing for the Rocky Hill Development (265 R, 277 R, 281, 287, 287 R, 287.5 Elm Street parcels) to the August 10, 2026 meeting
    Approved unanimously 5-0
July 13, 2026PLANNING BOARD
Continued Public Hearing
Continued public hearing (first heard 9-22-25) for Site Plan review under Section XI.V for the Rocky Hill Development at multiple Elm Street parcels.
  • CONTINUE
    Continue the continued public hearing and review for the Rocky Hill Development (Elm Street parcels) to the July 27, 2026 Planning Board meeting.
    Approved 7-0
June 8, 2026PLANNING BOARD
Continued Public Hearing
Site Plan review under Section XI.V for the Rocky Hill development. (Public hearing opened 9-22-25) Request to continue to July 13, 2026.
May 11, 2026PLANNING BOARD
Continued Public Hearing
Continued public hearing for Site Plan review under Section XI.V for the Rocky Hill development on Elm Street (265R, 277R, 281, 287, 287R, 287.5 Elm Street).
  • CONTINUE
    to continue Rocky Hill development to the June 8th meeting
    Approved 6-0
April 27, 2026PLANNING BOARD
Continued Public Hearing
Rocky Hill Development covering parcels 265 R, 277 R, 281, 287, 287 R, 287.5 Elm Street; Site Plan (Section XI.V). Original public hearing 9-22-25. Request to continue to May 11, 2026.
  • CONTINUE
    I make a motion that we continue Rocky Hill it's easier than saying everything
    Motion amended and continued to May 11th; Approved 6-0
April 13, 2026PLANNING BOARD
Continued Public Hearing
Continued site plan review (Section XI.V) for the Rocky Hill Development covering parcels at 265 R, 277 R, 281, 287, 287 R, 287.5 Elm Street; request to continue to 4/27/26. (PH 9-22-25)
  • CONTINUE
    I'll make a motion to continue the rocky hill development until April 27th
    Motion passed unanimously 6-0
March 9, 2026PLANNING BOARD
Continued Public Hearing
Continued public hearing for Site Plan (Section XI.V) review for the Rocky Hill Development at 265 R, 277 R, 281, 287, 287 R, 287.5 Elm Street.
  • CONTINUE
    motion by Keith second by Joel to continue Rocky Hill to April 13th
    Approved 7-0
February 23, 2026PLANNING BOARD
Continued Public Hearing
Site Plan review under Section XI.V for the Rocky Hill development (multiple Elm Street parcels); public hearing originally opened 9-22-25.
January 29, 2026PLANNING BOARD
Continued Public Hearing
Continued review of Site Plan for the Rocky Hill development (265 R, 277 R, 281, 287, 287 R, 287.5 Elm Street) — Section XI.V; item includes a request to continue to 2026-02-23 (original hearing 9-22-25).
  • CONTINUE
    I'll make a motion 265 our 277 our 281 287 287 our 287 and a half Elm Street the rocky hill development we continue to February 23rd
    Approved 7-0
January 26, 2026PLANNING BOARD
Continued Public Hearing
Continued Site Plan review for the Rocky Hill development covering multiple Elm Street parcels; includes review under Section XI.V (MBTA Communities Multi‑family Overlay District).
December 22, 2025PLANNING BOARD
Continued Public Hearing
Site Plan review for Rocky Hill Development covering 265 R, 277 R, 281, 287, 287 R, 287.5 Elm Street. Public hearing originally 9-22-25. Request to continue to 1/26/25.
  • CONTINUE
    to continue site plan 26 are 27 to 7 to 65 are 277 are 281 287 and the rest of those rocky hill development until the meeting of january 26 20 26 actually
    Motion passes unanimously.
November 10, 2025PLANNING BOARD
Continued Public Hearing
Continued public hearing for Rocky Hill Development (265 R, 277 R, 281, 287, 287 R, 287.5 Elm Street) — Site Plan review under Section XI.V (MBTA Communities Multi‑family Overlay District). Previous hearing 9-22-25.
  • OTHER
    motion by keith second by tom to authorize vhb to do the traffic and engineering peer review on rocky hill
    Approved 7-0
  • CONTINUE
    I make a motion that we continue the public hearing on rocky hill uh mbta development to the december 22nd meeting
    Continued 7-0
October 27, 2025PLANNING BOARD
Continued Public Hearing
Continued public hearing on Site Plan under Section XI.V (MBTA Communities Multi-family Overlay District) for the Rocky Hill Development encompassing 265 R, 277 R, 281, 287, 287 R, 287.5 Elm Street. (Previous hearing: 9-22-25)
  • CONTINUE
    Continue the public hearing for Rocky Hill Development to the November 10th meeting of the Planning Board.
    Approved 7-0
September 22, 2025PLANNING BOARD
New Public Hearing
Public hearing for Site Plan review under Section XI.V (MBTA Communities Multi-family Overlay District) for parcels 265 R, 277 R, 281, 287, 287 R, and 287.5 Elm Street (Rocky Hill Development).
  • CONTINUE
    I'll make a motion that we continue this public hearing to Monday, October 27th
    Approved 7-0
March 25, 2024PLANNING BOARD
Presentation
Presentation regarding the MBTA Multi-Family Project affecting 265, 277, 281, 287, 2871/2 Elm St.

Documents on file

AUG 17
8-17 peer review response supporting materails.pdf
AUG 17
RH Civil-Landscape Plans 8-17-26.pdf
AUG 17
RH Drain Report 8-17-26.pdf
AUG 17
Rocky Hill PR3 -Meeting Notes.pdf
AUG 13
MFOD Waiver Letter 8.12.26.pdf
AUG 6
2026-08-03_Rocky Hill Site Peer Review 3.pdf
JUL 8
RH Drain Report 7-8-26.pdf
JUL 1
MEI Peer Review Response No2 7-1-26.pdf
JUL 1
RH Civil-Landscape Plans 6-29-26.pdf
MAR 25
O and M Manuals 8-11-25.pdf
MAR 25
Peer review attachemnts Geotech and CF figures.pdf
MAR 25
Peer Review Response 3-25-26.pdf
MAR 25
RH Civil Landscpe 3-24-2026.pdf
MAR 25
Rocky Hill Def Sub 3-23-26.pdf
MAR 25
Stormwater Report 3-20-26.pdf
FEB 26
2026-02-25_Rocky Hill Site Peer Review.pdf
FEB 19
Rocky Hill RTC 02.18.26.pdf
FEB 12
Rocky Hill Amesbury MassDOT Section 61 Finding 11.07.25.pdf
FEB 12
Rocky Hill August 2025 FEIR Transportation Component.pdf
FEB 12
Rocky Hill Residences TIA Appendix 11_24.pdf
FEB 12
Rocky Hill transportation peer review.pdf
FEB 12
Rte 110 Improvements FDR August 2025.pdf
JAN 12
Stormwater Report 1-12-26.pdf
DEC 23
RH CIVIL AND LS REV1 12-22-25.pdf
DEC 23
ROCKY HILL-NORTH ARCH 12-02-25.pdf
DEC 23
ROCKY HILL - NORTH ARCH 25_1112.pdf
PDF
DEC 23
ROCKY HILL - SOUTH ARCH - REV 12-18-25.pdf
DEC 23
Stormwater Report 12-8-25.pdf
AUG 14
25_0801-GTA-SitePlanReviewSubmission.pdf
AUG 14
Abutters List.pdf
AUG 14
Form D.pdf
AUG 14
Narrative 8.13.25.rnd (002).pdf
AUG 14
RH Civil and LS Plans 8-11-25.pdf
AUG 14
RH SPR Application.pdf
AUG 14
Rocky Hill Draft Letter of Commitment 07_25.pdf
AUG 14
Rocky Hill Residences TIA 11_24.pdf
AUG 14
ROCKY HILL - SOUTH NEIGHBORHOOD 8-4-25.pdf
AUG 14
Stormwater Report 8-11-25.pdf