265, 277, 281, 287, 2871/2 Elm St - Site Plan Review
Rocky Hill is a two‑neighborhood, 381‑unit residential development proposed on roughly 65 acres along Elm Street, consisting of 85 for‑sale homes and 296 rental units with associated amenities, roads, trails and stormwater systems.
AI summary
A two‑neighborhood residential project on about 65 acres at multiple Elm Street parcels, Rocky Hill proposes 381 units total: 85 for‑sale homes in the South Neighborhood and 296 rental units in the North Neighborhood, plus community buildings, parks, trails and parking. Primary access is a single boulevard from Elm Street with a roundabout; utilities are proposed underground and 10% of units are designated Affordable Housing. City peer review has cleared many items but identified remaining technical reports, construction phasing details, O&M and legal recording documents to resolve before final approvals.
Gallery
Project details
What is proposed
Dale Development, LLC proposes the Rocky Hill MBTA Community, a residential development divided into two neighborhoods. The South Neighborhood is planned for 85 for‑sale homes in a mix of single‑family, duplex, triplex and fourplex buildings. The North Neighborhood is planned for 296 rental homes distributed across 29 separate residential buildings (building sizes shown in the plans from about 8 to 36 units). The submission lists community buildings, formal greens, pocket parks, a pool and fieldhouse, pickleball courts, a dog park, trails, sidewalks, parking (garages and surface lots), and landscaped open spaces.
Where and how big
The development is proposed on an assemblage of parcels on the east side of Elm Street (addresses include 265 R, 277 R, 281, 287, 287 R, and 287.5 Elm Street), described in the applicant materials as approximately 65 acres. The plans show two primary proposed parcels (one for the North Neighborhood and two for the South Neighborhood) with much of the site perimeter remaining as wooded open space that the applicant intends to protect with conservation easements.
Parking, access and transportation
Primary vehicular access is proposed via a single boulevard entrance from Elm Street; a roundabout is shown where the boulevard separates the South and North Neighborhoods. A secondary emergency access is proposed through the Amesbury Animal Hospital site via an existing easement. The applicant proposes dedicating the boulevard from Elm Street to the roundabout as a public road and keeping other internal roads private (North Neighborhood) or maintained by a homeowners’ association (South Neighborhood). Parking is provided by a mix of individual garages and surface parking; the applicant reports parking at roughly 2.87 spaces per residence in the South Neighborhood and 1.68 spaces per residence in the North Neighborhood, plus seven public spaces at the roundabout for trail access. The submission includes a Transportation Impact Assessment and shows pedestrian and bicycle connections to Elm Street bike lanes and nearby regional trails, with short‑term bike racks and longer‑term bicycle storage included in the landscape plans.
Special considerations and environmental controls
The applicant’s plans and technical reports address wetlands setbacks, stormwater management, and open space protection. Stormwater is proposed to be managed using surface and subsurface conveyance with infiltration‑based best management practices; the applicant’s materials include multiple stormwater and drainage reports and a MEPA Final Environmental Impact Report component. Utilities are proposed underground; lighting limits are specified in the submission (parking poles up to 18 feet, walkway/drive lighting up to 12 feet). The applicant states that 10% of units will be designated Affordable Housing and that conservation easements will be used to permanently protect wetlands, stream corridors and other sensitive areas.
Key outstanding technical and permitting items
City peer review (VHB) issued a multi‑round review with a fourth/status update (August 24, 2026). VHB notes many items have been provided or clarified but identifies remaining items to be resolved before final approvals or as conditions. Principal outstanding items include: confirmatory subsurface/infiltration testing and associated documentation (double ring locations, PE‑stamped infiltration reports, groundwater mounding analysis), a construction phasing/construction management plan describing interim conditions and safety during phased buildout, a final Operation & Maintenance (O&M) plan and Stormwater Pollution Prevention Plan for construction, recording or legal documentation to confirm the proposed lot consolidation (Definitive Subdivision endorsement/recording), long‑term ownership/easements and maintenance responsibilities for roads, trails and stormwater facilities, certain utility and electrical equipment locations, snow storage and waste collection planning, and finalization of some stormwater treatment sizing and pretreatment documentation. Several zoning compliance and waiver matters are noted for Planning Board determination.
Status
A Site Plan Review application was filed with the Amesbury Planning Board (August 2025 materials). The project has proceeded through City technical review (Technical Review Committee, Design Review Committee), state MEPA review (FEIR elements), and independent peer review by the City’s consultant. The Planning Board’s review process and final action remain pending; several technical items and legal recording steps have been identified by the peer reviewer as either outstanding or appropriate to address as conditions of approval.
Discussion at meetings
- APPROVEAccept Part One findings and waivers and Part Two conditions and approve the site plan for the Rocky Hill Development (as amended tonight, including added conditions regarding MEPA certificate amendments and MassWorks off-site traffic mitigation).
- CONTINUEContinue deliberation on the Rocky Hill Development site plan and definitive subdivision decision (discussion of draft decision/conditions) to the October 26, 2026 Planning Board meeting.
- OTHERClose the public hearing for the Rocky Hill Development Site Plan.
- OTHERClose the public hearing for the Rocky Hill Development Definitive Subdivision.
- CONTINUEContinue consideration and set final decision on the Rocky Hill Development Site Plan and Definitive Subdivision for October 14th at 7:00 p.m.
- OTHERAsk staff to begin drafting a decision for the Rocky Hill Development
- CONTINUEContinue the continued public hearing and review for the Rocky Hill Development (Elm Street parcels) to the July 27, 2026 Planning Board meeting.
- CONTINUEmotion by Keith second by Joel to continue Rocky Hill to April 13th
- CONTINUEI'll make a motion 265 our 277 our 281 287 287 our 287 and a half Elm Street the rocky hill development we continue to February 23rd
- CONTINUEto continue site plan 26 are 27 to 7 to 65 are 277 are 281 287 and the rest of those rocky hill development until the meeting of january 26 20 26 actually
- OTHERmotion by keith second by tom to authorize vhb to do the traffic and engineering peer review on rocky hill
- CONTINUEI make a motion that we continue the public hearing on rocky hill uh mbta development to the december 22nd meeting
- CONTINUEContinue the public hearing for Rocky Hill Development to the November 10th meeting of the Planning Board.
- CONTINUEI'll make a motion that we continue this public hearing to Monday, October 27th