Planning Board

Board approved the site plan for 9 Alenclair Drive (with landscaping bond clarified and ANSI gray finish required) and voted to hire VHB for traffic and stormwater peer review of the proposed 27.5–29 Clarks Road 146-unit development; the Board also heard presentations and public comment on projects at 45 Main Street (historic preservation/waivers) and 29 Lake Attitash Road (wetland/drainage concerns).

occurred Agenda PDF Minutes Video recording AI Summary
Key decisions
Approved site plan for 9 Alenclair Drive with two modifications: add condition requiring building/equipment to be ANSI gray and clarify that Condition 10 is a landscape performance bond tied to the final landscape plan.
Approved 7-0
Retained VHB to perform traffic and stormwater peer review (and general civil design conformance) for the proposed 27.5–29 Clarks Road development.
Approved 6-0 (Tracey Chalifour recused)
AI SUMMARY · DRAWN FROM THE MINUTES

The Planning Board meeting covered multiple public hearings and project presentations. The Board approved the site plan for 9 Alenclair Drive with two modifications: adding a condition requiring the building and equipment be ANSI gray and clarifying that Condition 10 is a landscape performance bond tied to the final landscape plan. Staff had circulated a draft decision addressing landscaping implementation and monitoring, fencing and gate materials/color, preservation of two on-site trees, dark-sky compliant lighting, DPW-required off-street improvements, and an erosion-control bond; the applicant had requested to avoid a performance bond but the Board required a reasonable landscaping surety and added the ANSI gray paint condition. Discussions included gate color (black preferred for durability) and biannual landscape monitoring/reporting to the Board with potential environmental monitor review and mitigation recommendations.

The Board also conducted preliminary reviews of three larger proposals. For 27.5–29 Clarks Road (an approximately 11-acre site with a proposed 146-unit multifamily building and smaller street-front residential buildings, trails, and open space conveyance), the applicant team presented site layout, stormwater and traffic studies, and landscape/trail plans; neighbors raised strong concerns about cumulative traffic impacts and sightlines. In response, the Board voted to hire VHB to perform a traffic and stormwater peer review and general civil-design conformance review. For 45 Main Street, the applicant seeks a Historic Preservation Permit, roof-raising by 4 feet, four new residential units above commercial space, and waivers (including onsite parking and affordable-unit requirements); the Board and staff noted additional required reviews (Historical Commission, Design Review Committee, TRC) and flagged parking/affordability waiver issues. For 29 Lake Attitash Road (a proposed single-family home in the Water Resource Protection District on a pre-existing nonconforming parcel), the Board and the public focused on wetland/stream buffers, stormwater/impervious-area assessment, and legal clarifications about the lot’s zoning/nonconforming status; the Board requested Conservation Commission review, a KP Law memo be provided, and appropriate stormwater analysis before further action.

Public comment highlighted traffic and cumulative development concerns on Clarks Road, objections and flood/drainage concerns related to the Lake Attitash proposal, and potential loss of light, parking pressure, and construction disturbance for the 45 Main Street project. The meeting also included an informational presentation about a temporary substation at 0 and 14 Mill Street (no vote), and several recusals were recorded where board members stepped aside from specific applications.

Generated by an LLM. Verify against the official record before quoting.

Points of interest

Substation conditions: gates, landscape monitoring, and performance bond
Substation conditions: gates, landscape monitoring, and performance bond
DEBATE
0:02:47–0:11:46 ▶ Watch
Board and applicant negotiated final special conditions for the proposed substation expansion, focusing on gate color (green vs. black), landscape preservation and three-year monitoring with biannual reports, and whether a limited landscape performance bond is required; the equipment color was confirmed cannot be changed and a general condition fixing the antique gray color was added.
Eagles Crossing: project overview, site design, and trail proposal
Eagles Crossing: project overview, site design, and trail proposal
PRESENTATION
0:22:41–0:32:35 ▶ Watch
Applicant gave the first public presentation of the Eagles Crossing proposal: an 11-acre site with development concentrated on ~4 acres (two 3‑unit houses plus a 146‑unit building), permanent conservation of remaining land, and a proposed walking trail connecting to the neighborhood; timeline, context in the East End Smart Growth overlay, and initial design intent were outlined.
Traffic study, public concern, and decision to hire independent peer reviewer
Traffic study, public concern, and decision to hire independent peer reviewer
PRESENTATION
0:46:22–1:30:44 ▶ Watch
Traffic impacts drew sustained attention: the traffic consultant presented trip-generation and intersection analyses, multiple residents raised detailed concerns about added traffic, circulation, and drainage, and the board voted to hire an outside peer reviewer (VHB) to review traffic, stormwater, and site circulation before continuing the hearing.

Motions & votes

AI-generated summaries of each motion's substance — not the official record. Verify against the meeting minutes or video before quoting.

@ 0:17:45 · APPROVE
Approved 7-0
I would make a motion that we approve the site plan for
@ 0:19:06 · OTHER
Approved 7-0
motion to close the public hearing. So moved second.
@ 1:28:03 · OTHER
Approved 6-0
So I'll make a motion that we hire VHP to do the traffic study and the stormwater review, peer review, on behalf of the board and the city.
MOVED · DAVID · SECONDED · KEITH
@ 1:30:44 · CONTINUE
Approved 6-0
I'd like to make a motion to continue the public hearing on 27 and a half 29 Clarks Road until December 8th
MOVED · KEITH · SECONDED · JOEL
@ 2:22:47 · CONTINUE
Approved 6-0
I'll make a motion to continue 45 Main Street to the site plan and special permit to the December 22nd meeting.
MOVED · KEITH · SECONDED · JOEL
@ 3:08:28 · CONTINUE
Approved Unanimous
So I'll make a motion that we continue 29 Lake Attitash special permit to the planning board meeting of December 22nd
MOVED · DAVID · SECONDED · KEITH
@ 3:13:41 · OTHER
Approved 6-1
all right motion to continue the meeting to 11 o'clock by tracy second by david
SECONDED · DAVID
UNDER · Motion — extend meeting time to 11:00 PM
@ 3:37:52 · OTHER
Approved Unanimous
Who wants to make a motion to adjourn so moved
MOVED · TOM · SECONDED · TRACY