Technical Review Committee
Project update and technical review for 18 Merrimac Street (Washington Landing Maritime Facility) including a proposed ramp replacement, seasonal floats, parking reconfiguration and a Harbor Master building; subdivision plan review for Rocky Hill Development addressing roadway layout, waivers, drainage design and potential public acceptance; construction management and fire-code review for renovations at 2–4 Elmwood Street.
The committee received a detailed project update on 18 Merrimac Street (Washington Landing Maritime Facility). GZA and partners reviewed plans to replace the deteriorated ramp with a longer, wider ramp (34 ft by ~124 ft with precast planks), add seasonal floats and an 80-foot aluminum gangway, and install an elevated 18x22 ft Harbor Master building on piles. The site plan also proposes reconfigured parking (including ADA and trailer spaces), new paving, a vegetated rain garden and shoreline stabilization using surplus granite. Substantial permitting and environmental review were noted, with a target to begin permitting at month-end and obtain approvals by the end of next year. Significant technical concerns were discussed at length: unknown/abandoned sewer and drain utilities on the eastern part of the property, a 200-foot discrepancy in the diffuser location versus original plans, and the critical need to locate utilities before pile installation; the committee recommended additional investigations (e.g., backhoe/excavation/diver inspections and permit investigation of the outlet) and confirmed coordination with MEVA ferry terminal planning and inclusion of future utility chases in the design.
The Rocky Hill Development subdivision and associated site plan were reviewed, covering lot layouts, a boulevard-style roadway ending at a roundabout, proposed waivers (including roadway width and a 750-foot dead-end waiver), on-street parking, and whether the city would accept the roadway and drainage. Presenters said they intend to seek city acceptance of the road and to dedicate drainage infrastructure, but acknowledged the HOA may be responsible for certain drainage elements; committee members stressed the need for clear easements and deed language if the city does not take drainage ownership. Technical staff raised questions about stormwater design, coverage/depth of utilities, and maintenance responsibilities for curb-to-property-line areas and center islands. Finally, the committee reviewed the construction management plan for 2–4 Elmwood Street (renovation of a two-family and new single-family home with garages); the applicant committed to on-site parking and dumpster placement and to submit a construction schedule. Fire department requirements were reiterated (Massachusetts Fire Code compliance and appropriate dumpster setbacks). No formal votes or recorded final actions on the projects were recorded in the minutes.